PROJECT DESCRIPTION

The City of Longwood is conducting a complete streets study on West Warren Avenue between State Road 434 and Milwee Street. This project was approved by the City of Longwood as a part of their Complete Streets Policy Opens new window ; a commitment to provide safe transportation options for all users.

The purpose of this complete streets project is to:

  • Enhance connectivity and accessibility between all modes of transportation, activity centers, and neighborhoods surrounding West Warren Avenue
  • Create a safe and supportive environment for walking and biking
  • Create a Multi-modal Vision and Plan that supports the City’s Economic Development initiatives
  • Develop a set of implementable improvements (alternatives) in the study area that can be designed and constructed

STUDY AREA

West Warren Avenue in the study area is a critical connection in the City of Longwood. It provides an entrance to the City’s Historic District, and is located in Longwood’s Heritage Village, which is anchored by the City’s SunRail station, located approximately one quarter mile from the eastern boundary of the project. West Warren Avenue is also surrounded by residential, commercial, and recreational land uses which have been growing in the past years and are projected to continue to grow. As such, the provision of multi-modal access for residents, visitors, and workers along the West Warren Avenue is key to the continued healthy growth of this corridor.

Need details for accessibility

PROJECT SCHEDULE

Assess Existing Conditions and Define Guiding Principles (November 2020 - May 2021)

During this phase the project team will collect information and data related to the existing conditions of the study area related to engineering, environmental, land use, traffic, crashes, transit, drainage, hydraulic, data and complete streets elements necessary to develop and evaluate a reasonable range of alternative improvement concepts. Guiding Principles will be developed to provide the structure for the examination of multimodal treatment options and the framework to evaluate various alternatives. The results of the existing conditions assessment and draft Guiding Principles will be presented at a Public Workshop to gain input from project stakeholders.


Define and Analyze Alternatives (May 2021 – December 2021)

The project team will develop alternative improvement concepts and analyze the benefits and impacts associated with each improvement concept. Alternative improvement concepts will be presented at a 2nd Public Workshop to share the results of the alternatives development and assessment and to solicit feedback from the community. Results of the analysis will be documented in the study reports. The selection of recommended improvements will be made at the end of this phase.


Refine Recommended Improvements (December 2021 – April 2022)

Following completion of the alternative analysis, the project team will refine the recommended improvement concepts to finalize the major elements of the project. These refinements will include estimating the final recommended right-of-way limits, pond locations, cost and other major features needed to advance the project to the subsequent design phase. The draft refined recommended improvement concept will be presented at a Public Meeting for the public to review and provide comments.


Contact Us


Shad M. Smith, PE
City of Longwood
Director of Public Works/City Engineer
(407) 260-3447

Amy Sirmans, PE
VHB
Consultant Project Manager
(407) 641-0688

Join Project Mailing List